Green Lane Rail

Newport, Wales

Tensar helped deliver a steep-sided rail overbridge embankment with a vegetated finish over weak ground, minimising the impact on a Site of Special Scientific Interest (SSSI) in South Wales. 

Benefits

  • Granular load transfer platform alternative to reinforced concrete slab
  • Enabling fast construction over very weak ground
  • Minimising environmental impact within a SSSI
Client's Challenge

A new embankment was needed for a replacement road bridge over a railway, as part of Network Rail’s electrification of the Great Western Mainline. Ground conditions were poor, with deep deposits of very weak alluvial clay, plus the site was in a SSSI. Main contractor Alun Griffiths had to provide a new embankment, up to 5m high, with a natural vegetated finish.

Tensar Solution

Tensar’s TensarTech Greenslope system enabled the 70 ̊ slopes to be vegetated, using galvanised steel mesh panels to achieve the 120-year design liferequired by Network Rail. Tensar’s Basetex high-strength geotextile reinforced the 900mm thick load transfer platform, transmitting loads onto the grid of piles supporting the embankment.

Products Used

Loading...