High-Profile Class 1 Rail Shipper

Mont Belvieu, TX

May 2019 

Tensar® saves you time when you can’t afford to wait for lime.

Installed by: Force Corporation

Client's Challenge

The client needed immediate rail access to another part of their facility due to capacity expansion and congested rail traffic at the existing switch. The project was already behind schedule and had a very short track construction window because railroad construction forces were scheduled to make the tie in. The track section was to be constructed over very soft soils that included a significant cut and then was to be replaced with lime treated structural fill. Tensar received an urgent call late one evening to see if we could assist with their project since they lacked the time required for the lime to cure.

Tensar Solution

Tensar proposed a three-layer design using two different multiaxial geogrids: one for subgrade stabilization in lieu of lime and for sub ballast reinforcement, and another with larger apertures for ballast reinforcement. The design had to be approved by the owner, Wilson/Company, SNC Lavalin, Benesch, Hanson, Fugro, the class 1 railroad, and Force Corporation. This solution can be designed using the rail module in Tensar+.

Products Used

Loading...

There are no results that match your search. Please try another search or Contact Us with further questions.